Answers / Production Facility Test

Production Facility Side-by-Side Test

For production environments with heavier airborne dust, the cleanest first step is a small side-by-side test, not a full rollout.

Paint one treated area beside one normal painted area. Watch how both hold up in your actual facility before deciding whether to scale.

Pick fair test areas

Use areas that see similar airflow, dust exposure, cleaning schedules, lighting, and traffic. Good options include work rooms, plant offices, storage areas, maintenance rooms, doors, trim, and painted walls near production traffic.

Use the same paint system

Keep the paint brand, color, sheen, primer, surface prep, and application method the same. The only thing that should change is whether RepelX was added.

Compare these areas

  • Control area: same paint without RepelX
  • RepelX test area: 1 fl oz per gallon
  • Only test a different dose if we recommend it for the job

Do not overdose

Ask us before changing the dose. More additive does not automatically mean better dust resistance and can start to affect the finish.

What to measure

Take photos after painting, then again after normal facility exposure. Ask maintenance, cleaning, and operations staff which area looks better, cleans easier, and still looks like the intended paint finish.

Need help with a production test?Tell us the facility type, paint gallons, surface areas, and whether dust is coming from production, storage, traffic, or general airflow.Ask about RepelX